PROJECTS

Q-RAIL WORKS AT PACKAGE 4
2018 - 2019

CONTRACT OWNER


PUBLIC WORKS AUTHORITY (ASHGHAL)

CONTRACT NAME


Q-RAIL WORKS AT PACKAGE 4

CONTRACT CONTENT

The scope of works comprises 1,300-meter-long cut & cover tunnel works including all relevant works as per drawing.

Some of the main quantities of the works executed by IRIS Construction are listed below;

  • Excavation & Disposal of Soil: 305,000 m³
  • Embankment Filling: 550,000 m³
  • Concrete Works: 121,500 m³
  • Formwork with Traveler System: 55,000 m²
  • Steel Works: 12,000 tons
  • Waterproofing: 108,000 m²
  • Dewatering Line with 315 mm – 630 mm pipe:13,400 m
  • 121 no’s Precast Beam (1m x 1m x 14m)

CONTRACT LOCATION


AL KHOR, KATAR