CONTRACT CONTENT

Qatar’s National Vision aims that – by 2030 – Qatar becomes an advanced society capable of sustaining its development and providing a high standard of living for its people. As part of this aim a nationwide program will provide a comprehensive infrastructure for new areas that lack infrastructure facilities, in addition to developing and enhancing existing infrastructure in central and suburban areas. 

Roads and Infrastructure in Semaisma Project is a mixed-use planned urban development consisting of a residential community, government buildings, schools and mosques. It is located 20 km North of Doha International Airport. AI Khor Expressway and North Shamal Roads provide the primary means of access to the community. 

The project area is predominately virgin land area with a limited number of commercial plots along Semaisma Road and is known as Semaisma West. This area will benefit from a complete installation of regulatory infrastructure.

The project is a part of the program, and will deliver a comprehensive infrastructure service to 556 Plots in a 1,450,000 square meter area (145 hectares) and a 56,000 square meter Emergency Flood Area for stormwater.

The project covers 3 zones, 2 zones in suburban areas and one zone in urban areas, including the development of roads, drainage, and new infrastructure in the following main disciplines.

  • Foul Sewer Works
    • 3,260 m - NDM (Microtunneling)
    • 11,000 m - Pipes in Trenches
  •  Storm Water Drainage
    • 600 m - NDM (Microtunneling) in urban area to storm water pumping station
    • 35,000 m - Pipes in Trenches
  • TSE Treated Sewerage Effluent
    • 7,000 m - Pipes in Trenches
  • Other wet utilities
    • 19,000 m - Pipes in Trenches – Potable Water
    • 4,000 m - Pipes in Trenches – Irrigation System
    • 7,000 m – House connections
  • Emergency Flooding Area (Pond) for Storm Water
  • Dry Utilities
    • CRA, Ooredoo, QAF,
    • 132 kV EHV, HV, MV and LV works

 

  • Total Road Length = 21,700.00 m
  • Excavation Works = 754,178.42 m³
  • Filling Works = 447,550.99 m³
  • Sub-base = 83,909.64 m²
  • Road Base = 263,376.42 m²
  • Pavement = 419,272.18 m²
  • Concrete = 74,476.21 m³
  • Reinforcing Steel = 1,005.73 tons
  • Formwork = 84,671.00 m²

CONTRACT LOCATION